Seicogroup
  • (+84) 24 22106611
  • |
  • hnsales@seico.vn

Berita perusahaan

Writing
  • 20
  • Jul

SEICO SUMMER TRIP 2026: UNITED THROUGH EVERY WAVE – TOGETHER TOWARD SUCCESS

The SEICO Summer Trip 2026 brought employees and their families together through a series of meaningful activities that strengthened team cohesion, fostered SEICO's corporate culture, and re-energized our people for the journey ahead.

Lihat lebih banyak
Writing
  • 01
  • Jul

SEICO Mid-Year Review Conference: First-half Business Results and Second-half 2026 Objectives

On the morning of June 27, 2026, SEICO's Board of Directors, together with department managers, deputy managers, and key personnel, gathered for the Mid-Year Review Conference to assess business performance during the first six months of the year and align on objectives and action plans for the remainder of 2026.

Lihat lebih banyak
Writing
  • 17
  • Jun

Duc Thinh New Materials Factory - SEICO’s Integrated Solution For High-Corrosion Environments

Located in Nghe An Province, the Duc Thinh New Materials Factory operates in an environment with high concentrations of calcium dust. This is a common characteristic of the stone powder manufacturing industry and can significantly accelerate corrosion of steel structures and roofing systems if the facility is not properly designed and protected from the outset.

Lihat lebih banyak
Writing
  • 02
  • Jun

SEICO Receives Positive Customer Evaluation Letter from Duc Thinh New Material Technology Co., Ltd.

Customer satisfaction has always been the most important measure of SEICO’s service quality and project execution capability. Recently, SEICO was honored to receive an evaluation letter from Duc Thinh New Material Technology Co., Ltd., recognizing the efforts and achievements delivered by the SEICO team throughout the project implementation process.

Lihat lebih banyak
Writing
  • 14
  • Apr

SEICO – COMMITMENT TO QUALITY & INTERNATIONAL STANDARDS

In steel structures, welds serve as a critical “link” that directly determines the overall strength and safety of the entire structure. Regardless of how optimized the design is or how high-quality the materials are, inadequate welding can still pose significant technical risks during operation.

Lihat lebih banyak
Writing
  • 02
  • Apr

SEICO GROUP TEAM MASTERS THE 2026 TECHNICAL STANDARDS

SEICO GROUP provides training on the 2026 Technical Requirements to ensure a correct and unified understanding across the entire system, enabling all teams to be ready to apply the new technical standards from the outset.

Lihat lebih banyak
Writing
  • 26
  • Mar

FOOTBALL MATCH: HANOI OFFICE – HAI PHONG FACTORY

On the afternoon of Saturday, March 21, a friendly football match between the Hanoi Office and the Hai Phong Factory took place in a vibrant, enthusiastic, and highly sporting atmosphere.

Lihat lebih banyak
Writing
  • 03
  • Mar

SEICO: GROUNDBREAKING CEREMONY FOR READY-BUILT FACTORY AND WAREHOUSE PROJECT IN HAI PHONG

On February 26, 2026, Seico held the groundbreaking ceremony for the ready-built factory and warehouse for lease project at Lot CN2B, Nam Dinh Vu Industrial Park (Zone 2), Dong Hai 2 Ward, Hai An District, Hai Phong City.

Lihat lebih banyak

(+84) 24 22106611

Kontak