SEICO ACCOMPANIES LONG GOLD HAI PHONG PROJECT
-
22/10/2025
Every project begins with strong and reliable steel frames.
On the construction site today, SEICO’s team is diligently assembling each component and every precise joint to build the “skeleton” of a large-scale project.

The Long Gold Hai Phong project includes:
- 1,200 tons of structural steel
- 200 tons of purlins
- 25,000 m² of roofing sheets
- 14,800 m² of steel deck flooring
.png)
These impressive figures not only highlight the scale of the project but also affirm SEICO’s execution capability in accompanying key developments.
Stay tuned for the completed look of this project – where durable steel is given a “new coat” and transformed into a modern production and business space.
✨ SEICO – Shaping the future with steel! ✨
-------------------
SEICO STEEL
Website: http://seico.vn
Email: hnsales@seico.vn
YouTube: www.youtube.com/@SEICOJSC
LinkedIn: SEICO JSC trên LinkedIn
Berita terkait
- 20
- Jul
TECHNICAL INSIGHT: MODERN TEXTILE MANUFACTURING FACILITIES
- 20/07/2026
SEICO has participated in the development of multiple facilities within Thai Tuan Group’s integrated textile, dyeing, and garment manufacturing system. With more than 30 years of growth and industry leadership, Thai Tuan is recognized as one of Vietnam’s leading textile brands. Through these projects, SEICO has gained a deep understanding of the key requirements for textile manufacturing facilities:

- 17
- Jul
CORE 5 Quang Ninh - When Logistics Requires More Than A Conventional Warehouse
- 17/07/2026
The CORE5 Quang Ninh project stands as a testament to SEICO’s capability in partnering with investors and developers to deliver modern logistics centers, enhancing supply chain efficiency and supporting the evolving growth demands of the market in the years ahead.

- 14
- Jul

- 07
- Jul
Optimizing Factory Construction Schedules with SEICO’s Steel Structure Solutions
- 07/07/2026
SEICO is honored to be selected by Taisan Vietnam Co., Ltd. as the trusted partner to provide an integrated construction solution for the Taisan Vietnam Factory Project at VSIP Quang Ngai Industrial Park.
- 01
- Jul
SEICO Mid-Year Review Conference: First-half Business Results and Second-half 2026 Objectives
- 01/07/2026
On the morning of June 27, 2026, SEICO's Board of Directors, together with department managers, deputy managers, and key personnel, gathered for the Mid-Year Review Conference to assess business performance during the first six months of the year and align on objectives and action plans for the remainder of 2026.

- 23
- Jun
FDI surges ahead, driving the need for more integrated industrial infrastructures solutions
- 23/06/2026
Vietnam continues to strengthen its position as one of the region’s most attractive destinations for foreign direct investment (FDI). During the first four months of 2026, total registered FDI exceeded USD 18.2 billion, representing a 32% increase compared to the same period last year.
.png)
- 24
- Jun
The Rainy and Storm Season is Approaching - Is Your Facility Ready?
- 24/06/2026
Every year, heavy rainfall, strong winds, flooding, and landslides significantly impact the operations of factories and industrial facilities across the country.

- 19
- Jun
A New USD 25 Million FDI Project Takes Shape with SEICO's Integrated Solutions
- 19/06/2026
SEICO continues to strengthen its presence in the industrial construction sector by being selected as a trusted partner for a large-scale FDI project at VSIP Quang Ngai Industrial Park.
Vietnam
English
Japan
Korea
China
Indonesia
Thailand