STEEL STRUCTURE PREPARATION - THE FOUNDATION FOR SUSTAINABLE STEEL STRUCTURE SOLUTIONS
-
07/01/2026
In steel structure fabrication, proper surface preparation prior to coating is a critical process that directly affects the quality and durability of the structure. Steel surfaces often contain dust, grease, rust, or mill scale; if not thoroughly removed, these contaminants significantly reduce coating adhesion, leading to premature peeling and early corrosion.
Surface Preparation Methods
Depending on technical requirements and site conditions, steel surfaces may be prepared using methods such as sand blasting, steel grit blasting, high-pressure water jetting, or chemical treatment. These processes effectively remove contaminants and create a uniform surface suitable for coating application.
.png)
Surface preparation process effectively remove contaminants and create a uniform surface suitable for coating application.
Benefits of Properly Prepared Surfaces
A properly cleaned steel surface enhances coating adhesion and improves protection against environmental factors such as moisture, chemicals, and extreme temperatures. In addition, surface preparation allows early detection of material defects, enabling timely corrective actions before coating.
.png)
Proper surface preparation prior to coating is a critical process that directly affects the quality and durability of the structure.
SEICO's Standards
At SEICO, all steel structures are surface-prepared to a minimum of SA 2.0 prior to coating, and can be upgraded to SA 2.5 or SA 3.0 in accordance with specific project requirements.
Contact SEICO for professional consultation on steel surface preparation and corrosion protection solutions tailored to your project.
-------------------
SEICO STEEL
Website: http://seico.vn
Email: hnsales@seico.vn
YouTube: www.youtube.com/@SEICOJSC
LinkedIn: SEICO JSC trên LinkedIn
Berita terkait

- 02
- Jun
SEICO Receives Positive Customer Evaluation Letter from Duc Thinh New Material Technology Co., Ltd.
- 02/06/2026
Customer satisfaction has always been the most important measure of SEICO’s service quality and project execution capability. Recently, SEICO was honored to receive an evaluation letter from Duc Thinh New Material Technology Co., Ltd., recognizing the efforts and achievements delivered by the SEICO team throughout the project implementation process.

- 26
- May
- 26/05/2026
In steel structures factory, the biggest challenge for floor systems is not only load-bearing capacity, but also vibration stability, long-span capability, and construction optimization. This is exactly why SP Deck technology was developed — representing a major advancement beyond traditional deck slab systems.

- 23
- May
SEICO x YOKOREI: Steel Structure Solutions Meeting Cold Storage Industry Standards
- 23/05/2026
The cold storage industry requires steel structures to meet highly demanding technical standards to ensure stable and long-term operation under extreme environmental conditions. Beyond load-bearing performance, steel structures must provide excellent corrosion resistance and structural stability in low-temperature, high-humidity environments with continuous operation.

- 15
- May
AURORA IP WASTEWATER TREATMENT PLANT: OPTIMIZING OPERATIONS WITH A COMPREHENSIVE SOLUTION FROM SEICO
- 15/05/2026
The Wastewater Treatment Plant project at the Rang Dong Textile Industrial Park – Aurora IP has been planned with a total treatment capacity of up to 110,000 m³ per day, developed through multiple modern treatment modules to meet sustainable operational demands and increasingly strict environmental standards.

- 14
- May
CASE STUDY: REDUCING TOTAL STEEL STRUCTURE WEIGHT BY 20% THROUGH DESIGN OPTIMIZATION
- 14/05/2026
In high-tech agricultural projects, the challenge is not only about “designing a structure that is safe enough,” but also about optimizing investment costs, construction efficiency, and long-term operational performance.
(7).png)
- 08
- May
SEICO x Core5 Hai Phong – Phase 2 at Nam Dinh Vu Industrial Park
- 08/05/2026
Progress update on the structural steel package at the Core5 Hai Phong project – one of the modern, sustainability-oriented industrial developments at Nam Dinh Vu Industrial Park.

- 30
- Apr
Molex Project - Seico's mark in the high-tech industry
- 30/04/2026
Seico is proud to partner with the Molex Project—part of Koch Industries—through Molex Vietnam. This is a flagship project in the high-tech sector, focusing on the production of high-speed connectivity cables, multi-core cables, and fiber optic modules

- 27
- Apr
Concordia International School – A Mark of SEICO’s Steel Structure Solutions
- 27/04/2026
Concordia International School Hanoi, recognized as one of the most prestigious international educational institutions in Hanoi, stands as a representative project showcasing SEICO’s capabilities in delivering complex steel structure solutions that require advanced technical expertise and precise coordination among all stakeholders.
Vietnam
English
Japan
Korea
China
Indonesia
Thailand