OPENING CEREMONY OF SEICO's REPRESENTATIVE OFFICE
-
20/11/2022
This November, SEICO's representative office (Seico PH) has been officially established in Manila, Philippines. The Opening Ceremony took place successfully with the attendance of Seico's clients.
We believe that SEICO has not only been the domestic steel structure and equipment industries supplier but also expanded to the overseas market.
We would like to wish the Representative office in the Philippines lots of success and always be the best choice for all investors!
-----------------
Address of Seico PH Office: Room 305 Semicon Corporate Bldg, #50 Marcos Highway, Bgy Dela Paz, Pasig City, Philippines
Contact: Mr. Henry: (+63) 917 142 7435




Tin tức liên quan

- 06
- Jun
- 06/06/2026
On May 30, 2026, Biboy World Water Park, located within Phuong Dong Wonder Island Urban Area in Van Don, Quang Ninh Province, officially welcomed its first visitors, marking the beginning of an exciting summer season.
Xem thêm
- 02
- Jun
SEICO Receives Positive Customer Evaluation Letter from Duc Thinh New Material Technology Co., Ltd.
- 02/06/2026
Customer satisfaction has always been the most important measure of SEICO’s service quality and project execution capability. Recently, SEICO was honored to receive an evaluation letter from Duc Thinh New Material Technology Co., Ltd., recognizing the efforts and achievements delivered by the SEICO team throughout the project implementation process.
Xem thêm
- 26
- May
- 26/05/2026
In steel structures factory, the biggest challenge for floor systems is not only load-bearing capacity, but also vibration stability, long-span capability, and construction optimization. This is exactly why SP Deck technology was developed — representing a major advancement beyond traditional deck slab systems.
Xem thêm
- 23
- May
SEICO x YOKOREI: Steel Structure Solutions Meeting Cold Storage Industry Standards
- 23/05/2026
The cold storage industry requires steel structures to meet highly demanding technical standards to ensure stable and long-term operation under extreme environmental conditions. Beyond load-bearing performance, steel structures must provide excellent corrosion resistance and structural stability in low-temperature, high-humidity environments with continuous operation.
Xem thêm
- 15
- May
AURORA IP WASTEWATER TREATMENT PLANT: OPTIMIZING OPERATIONS WITH A COMPREHENSIVE SOLUTION FROM SEICO
- 15/05/2026
The Wastewater Treatment Plant project at the Rang Dong Textile Industrial Park – Aurora IP has been planned with a total treatment capacity of up to 110,000 m³ per day, developed through multiple modern treatment modules to meet sustainable operational demands and increasingly strict environmental standards.
Xem thêm
- 14
- May
CASE STUDY: REDUCING TOTAL STEEL STRUCTURE WEIGHT BY 20% THROUGH DESIGN OPTIMIZATION
- 14/05/2026
In high-tech agricultural projects, the challenge is not only about “designing a structure that is safe enough,” but also about optimizing investment costs, construction efficiency, and long-term operational performance.
Xem thêm(7).png)
- 08
- May
SEICO x Core5 Hai Phong – Phase 2 at Nam Dinh Vu Industrial Park
- 08/05/2026
Progress update on the structural steel package at the Core5 Hai Phong project – one of the modern, sustainability-oriented industrial developments at Nam Dinh Vu Industrial Park.
Xem thêm
- 30
- Apr
Molex Project - Seico's mark in the high-tech industry
- 30/04/2026
Seico is proud to partner with the Molex Project—part of Koch Industries—through Molex Vietnam. This is a flagship project in the high-tech sector, focusing on the production of high-speed connectivity cables, multi-core cables, and fiber optic modules
Xem thêm
Vietnam
English
Japan
Korea
China
Indonesia
Thailand