(5).png)
- 20
- Mar
SEICO Accompanies Thai Tuan Group on a 470 Million USD Factory
With a strong development orientation in the textile and garment sector, Thai Tuan Group has invested in the construction of a large-scale fabric manufacturing plant with a total investment of over 470 Million USD.
Lihat lebih banyak
- 13
- Mar
SEICO’s Milestone in the Thailand Market
The project in Thailand marks an important milestone in SEICO’s journey to expand its presence in international markets.
Lihat lebih banyak(2).png)
- 27
- Feb
From the Seico's plant to a project in Sydney
These UB steel sections have just been completed and are ready for their journey to Australia – a market where projects come with highly stringent technical standards for materials, fabrication, and surface protection.
Lihat lebih banyak
- 27
- Jan
UNDER-FILM CORROSION IN STEEL STRUCTURE - THE SILENT DESTROYER BENEATH PROTECTIVE COATINGS
In the steel structure industry, many believe that a visually flawless paint coating is enough to ensure proper steel protection.
Lihat lebih banyak
- 23
- Jan
SEICO IS PROUD TO PARTNER WITH THE HLI ECOHUB NAM HA PROJECT
Seico is proud to provide steel structure solutions for the green and sustainable ready-built factory complex developed by Hoa Long Invest (HLI), designed in accordance with international LEED standards. The project integrates energy-efficient solutions and minimizes environmental impact.
Lihat lebih banyak.png)
- 07
- Jan
STEEL STRUCTURE PREPARATION - THE FOUNDATION FOR SUSTAINABLE STEEL STRUCTURE SOLUTIONS
In steel structure fabrication, proper surface preparation prior to coating is a critical process that directly affects the quality and durability of the structure. Steel surfaces often contain dust, grease, rust, or mill scale; if not thoroughly removed, these contaminants significantly reduce coating adhesion, leading to premature peeling and early corrosion.
Lihat lebih banyak.png)
- 30
- Dec
SEICO X OUTDOOR EQUIPMENT MANUFACTURING FACTORY PROJECT – HAI PHONG
The Outdoor Equipment Manufacturing Factory Project in Hai Phong is being developed on a modern scale, meeting high requirements in functionality, construction schedule, and quality. Accompanying the project, SEICO continues to affirm its capabilities and reputation by delivering steel structure solutions for industrial factory buildings.
Lihat lebih banyak.png)
- 10
- Dec
DISCOVER THE MOST STUNNING CURVED STEEL ROOF IN VAN DON
The Phuong Dong Van Don Entertainment Complex is one of the most architecturally distinctive developments in Van Don, Quang Ninh. Beyond its impressive scale, the project sets exceptionally demanding requirements for “non-standard” steel structures: large spans, elegantly curved geometry, complex spatial trusses, and near-perfect aesthetic standards.
Lihat lebih banyak
Vietnam
English
Japan
Korea
China
Indonesia
Thailand